Focus On Water Division
Pay For Performance
Previously Awarded Site Summary

Intended for use by NDEE's pre-qualified Pay for Performance Contractors.

Potential bidding Contractors should not contact the State Contractor that performed the Tier 1 & 2 with questions about the site.

Those types of questions should be addressed to Phil Hargis at (402) 471-3150 or Email at Phil.Hargis@Nebraska.Gov.

Date: 3/19/09 
Site Name: Magers Oil
UG# 051193-RM-1250
Address: 902 N. Jeffers
County: Lincoln
Closest Town North Platte
Legal Description: NW SW NE S33, T14N, R30W
Contractor Performing Assessment: Several Contractors performed the initial assessment.
Tier 1 Date: 11/16/93 (Initial Assessment)
Tier 2 Date: 8/4/08  Terracon performed the PFP assessment in August of 2008.
Property Owner’s Name: NA (Several)
Property Owner’s Phone Number: NA
Contamination Types: Gasoline, Diesel
PFP Bid Number: NE-028 (bid with NE-029)
Posting Date: 6/2/09 
Closing Date for requesting clarifications from the NDEE: 6/30/09 
Clarifications to relevant qustions will be issued by the NDEE by: 7/10/09 
Bid Submittal Deadline 8/5/09 at 2:00 pm central time.
Site Summary:

The North Jeffers Street area of North Platte has had numerous releases due to UST's. Some of the contamination plumes overlap, and NDEQ has spent several years detailing the existing plumes and identifying sources. NDEQ will release this cleanup as a pair of sites that will be posted as individual sites but will be awarded together. The contractor must bid each site in this pair individually, and two Contracts will be awarded to the Contractor with the lowest bid sum. Each individual site will have its own defined area of cleanup with its own monitor wells, SSTLs, incremental and final payments, etc. In addition, the entire area for both cleanups will have one SSTL for soil vapor concentration. The soil vapor SSTL will not be used for any portion of the contracts except the final payment. NDEQ has met with the City, and we have their support. Since many property owners will be involved and tight working conditions exist, these sites may present some unique challenges. The NDEQ Project Manager will help with access issues as much as possible. You may also want to review the Contract concerning property access issues and delays of that nature.
Table 1. Final Tier 2 Sampling Results:

Sampled 4/7/08


Units in mg/l
Well
Benzene
Toluene
Ethybenzene
Xylenes
MTBE
n-Hexane
Naphthalene
Diesel
Total Conc.
MR-1*
FP
FP
FP
FP
FP
FP
FP
FP
FP
M-2
1.720
.498
.365
.835
ND
ND
ND
5.560
8.978
M-5
3.090
.0989
.473
1.590
.0146
.226
.320
.617
6.4295
M-11*
FP
FP
FP
FP
FP
FP
FP
FP
FP
M-18
.570
.0174
.0633
.105
.010
.002
.010
.753
1.5307
M-20
10.600
8.25
.904
5.790
ND
.137
ND
2.270
27.951
M-23
4.530
11.700
1.360
7.780
ND
.196
ND
3.010
28.5760
M-28
.117
.002
.007
.008
.007
ND
ND
ND
.141
M-29
1.210
.0348
.152
.869
.0167
.113
.159
.642
3.1965
E-35
.0079
ND
ND
ND
.0036
ND
ND
ND
.0115
Total Concentration of Wells Exceeding SSTLs.
21.8449
20.6011
3.3243
16.977
.0519
.674
.489
12.852
76.8142
SSTL Total From Table 2.
8.473
353.811
79.198
127.277
29.707
4.754
30.828
12,966.481
13600.529
**Concentration Over SSTLs
13.3719
Not Over
Not Over
Not Over
Not Over
Not Over
Not Over
Not Over
Not Over
M-3***
.012
.129
.0331
.097
ND
.006
.0542
ND
.3313
M-4***
.0408
.001
.003
.005
ND
ND
ND
ND
.0498
M-6***
ND
ND
ND
ND
ND
ND
ND
ND
ND
M-7***
ND
ND
ND
ND
ND
ND
ND
ND
ND
M-9***
ND
ND
ND
ND
ND
ND
ND
ND
ND
M-13***
ND
ND
ND
ND
ND
ND
ND
ND
ND
M-14***
.001
ND
ND
ND
.007
ND
ND
ND
.008
M-16***
ND
ND
ND
ND
.008
ND
ND
ND
.008
M-17***
.001
.006
.166
.171
ND
.002
,040
ND
.386
M-19***
ND
.003
.063
,177
ND
.009
.048
ND
.300
M-22***
1.310
4.840
.756
3.010
ND
,0286
.147
.386
10.4776
M-26***
ND
ND
ND
ND
ND
ND
ND
ND
ND
E-26***
ND
ND
ND
ND
ND
ND
ND
ND
ND
E-28***
ND
ND
ND
ND
ND
ND
ND
ND
ND
*Monitor Wells M-1 & M-11 will not be used for interim payment but will have SSTLs for final payment.
** The concentration over SSTLs is the figure used to calculate the 25, 50 and 75% reduction payment levels
*** These monitor wells are at or below calculated SSTLs. The levels of concentration for these wells are not included in the Plume Initial Concentration Total.
Table 2. SSTLs:

Well

Benzene
Toluene
Ethybenzene
Xylenes
MTBE
n-Hexane
Naphthalene
Diesel
MR-1**
2.030
>SOL
>SOL
>SOL
7.013
>SOL
>SOL
3047.000
M-2
.778
>SOL
>SOL
>SOL
2.754
>SOL
>SOL
1210.00
M-5
.084
320.000
24.859
>SOL
.305
>SOL
29.400
137.000
M-11**
1.697
>SOL
>SOL
>SOL
5.974
>SOL
>SOL
2610.000
M-18
.145
>SOL
46.308
>SOL
.523
>SOL
>SOL
234.000
M-20
1.697
>SOL
>SOL
>SOL
5.974
>SOL
>SOL
2610.000
M-23
2.003
>SOL
>SOL
>SOL
7.013
>SOL
>SOL
3047.000
M-28
.017
16.618
3.663
58.673
.065
>SOL
.719
30.597
M-29
.017
15.939
3.571
57.108
.064
>SOL
.682
30.035
E-35
.005
1.254
.797
11.496
.022
4.754
.027
10.849
SSTL Total
8.4730
353.811
79.198
127.277
29.707
4.754
30.828
12966.481









M-3*
2.003
1.000
.700
10.000
7.013
4.000
.020
3047.000
M-4*
.131
1.000
41.328
10.000
.473
4.000
.020
212.000
M-6*
.034
62.947
8.431
141.000
.124
4.000
3.865
57.307
M-7*
.097
407.000
29.398
10.000
.352
4.000
.020
158.000
M-9*
.067
217.000
19.041
10.000
.243
4.000
18.135
110.000
M-13*
.024
33.548
5.657
92.935
.091
4.000
1.749
42.215
M-14*
.021
25.566
4.776
77.707
.080
4.000
1.241
37.187
M-16*
.018
18.860
3.959
63.700
.069
4.000
.844
32.377
M-17*
.254
1.000
85.762
10.000
.907
4.000
.020
403.000
M-19*
2.003
1.000
.700
10.000
7.013
4.000
.020
3047.000
M-22*
2.003
1.000
.700
10.000
7.013
4.000
.020
3047.000
M-26*
.005
1.007
.703
10.046
.020
4.023
.020
10.027
E-26*
2.003
1.000
.700
10.000
7.013
4.000
.020
3047.000
E-28*
.009
4.354
1.641
24.951
.036
12.334
.131
17.413
*These Monitor Wells are at or below SSTLs
**Monitor Wells M-1 & M-11 will not be used for interim payment but will have SSTLs for final payment.

There will be a site-wide, soil-vapor SSTL for both sites. It will be exactly the same number for both sites, and NDEQ can sample anywhere within the cleanup area to verify the cleanup level has been met. The cleanup area is shown in the green shaded area on the Plume Division Map below. The Benzene SSTL is 75.242 mg/m3 and is verified for final payment by direct push sampling methods. Benzene is the only COC that exceeds SSTLs for soil parameters.
Pictures:


MAPS:
Area


(See attached file: land owner table.pdf)

(See attached file: 05037186C14.pdf)

(See attached file: Topographic Survey.pdf)

SizeFile Name
42 KB land owner table.pdf
229 KB 05037186C14.pdf
2,907 KB Topographic Survey.pdf
Benzene Contour


(See attached file: Plume Division Map.pdf)
Site Specifications:


1. This site has a working remediation system installed on it. The winning PFP Contractor may use the existing system to aid the PFP cleanup, or has the option to have NDEQ remove the system in part, or in its entirety. In either case, the system belongs to the State. If the PFP Contractor uses the existing system, the expectation is that the system be returned to the State in the same working condition as when the PFP Contract was awarded.

2. This site (NE-028) is one half of the North Platte, two-site bid package (also including NE-029). A separate bid for each of these two sites must be submitted. The lowest total bid for both sites will be awarded the Contract.

3. This site file is very large with over 50 files and reports. You may want to be specific about what you would like to have copied or visit NDEQ to see the entire file before requesting copies.
Site Questions and Answers: