Date: 3/2/07 
Site Name: Millers Corner
UG# 110193-GH-1400
Address: Highway 281 and Highway 70
County: Wheeler
Closest Town Bartlett
Legal Description: SE1/4, SE1/4, SE1/4 Sect. 2, T23N, R11W
Contractor Performing Assessment: RDG
Tier 1 Date: 1/18/03 
Tier 2 Date: 11/26/03 
Property Owner’s Name: Jim Miller
Property Owner’s Phone Number: 308-654-3477
Contamination Types: Gasoline
PFP Bid Number: NE-023
Posting Date: 3/15/07 
Closing Date for requesting clarifications from the NDEE: 5/25/07 
Clarifications to relevant qustions will be issued by the NDEE by: 6/1/07 
Bid Submittal Deadline 6/15/07 at 2:00 pm central time.
Site Summary:

NDEQ first became aware of this site in 1992 through a report of a surface release by the State Fire Marshal (SFM). Based on discussions with the SFM and area residents, this site has had a long history of releases, from UST's, AST's and poor housekeeping, dating back to before 1980. In 1992, the site was added to the orphan tank program and the investigation process was begun. This site is located about 40 miles south of O'Neill on Highway 281. This area is characterized as the transition zone between the sand hills region to the west and the glaciated loess plains to the east. Shallow groundwater, typically four feet or less occurs in this area and there are artesian wells at this site.
Table 1. Final Tier 2 Sampling Results:


Diesel was not tested because the historical values have been very low.

Well
Benzene
Toluene
Ethylbenze
Xylenes
n-Hexane
MTBE
Naphthalene
Total Concentration
MW-5
.311
1.340
.340
1.780
.046
ND
.061
3.878
MW-10
5.640
.221
.560
2.910
.006
.180
.159
9.676
MW-12
10.900
23.400
2.190
11.300
.247
ND
.892
48.929
MW-16
.188
.012
.031
.316
.002
ND
ND
.549
Plume Total Concentration
17.039
24.973
3.121
16.306
.301
.180
1.112
63.032
Plume SSTL Concentration
.267
480.659
82.683
83.473
>SOL
.969
56.912
704.963
Plume Initial Concentration above SSTLs
16.772
Not Over
Not Over
Not Over
Not Over
Not Over
Not Over
Not over
MW-1*
.125
.094
.212
.997
.006
ND
.019
1.453
MW-2*
.094
.128
.048
.621
.011
ND
.042
.944
MW-3*
.014
.046
.011
.133
.003
ND
.014
.221
MW-4*
.005
.066
.001
.003
.001
ND
.005
.081
MW-6R*
ND
ND
ND
ND
ND
ND
ND
ND
MW-7*
ND
ND
ND
ND
ND
ND
ND
ND
MW-8*
ND
ND
ND
ND
ND
ND
.009
.009
MW-9*
.004
ND
ND
ND
ND
ND
ND
.004
MW-11*
ND
ND
ND
ND
ND
ND
ND
ND
MW-13*
ND
ND
ND
.014
ND
ND
ND
.014
MW-14*
ND
ND
ND
ND
ND
ND
ND.
ND
MW-15*
ND
ND
ND
.005
ND
ND
ND
.005
MW-17*
ND
ND
ND
.008
ND
ND
ND
.008
MW-18*
ND
ND
ND
ND
.001
ND
ND
.001
MW-19*
.018
.003
.030
.543
.004
ND
ND
.598
MW-20*
.003
ND
ND
.003
ND
ND
ND
.003
MW-21*
ND
ND
ND
ND
ND
ND
ND
ND
Units in mg/l, sampled 8/22/06
*These monitor wells are at or below detection limits, or calculated SSTLs
Table 2. SSTLs:

Well

Benzene
Toluene
Ethylbenzene
Xylenes
n-Hexane
Naphthalene
MTBE
MW-5
.136
>SOL
45.797
>SOL
>SOL
>SOL
.488
MW-10
.056
236
16.449
>SOL
>SOL
29.358
.205
MW-12
.053
214
15.474
>SOL
>SOL
25.700
.195
MW-16
.022
30.659
4.963
83.473
>SOL
1.854
.081








MW-1*
.139
>SOL
48.769
>SOL
>SOL
>SOL
.496
MW-2*
.139
>SOL
48.769
>SOL
>SOL
>SOL
.496
MW-3*
.139
>SOL
48.769
>SOL
>SOL
>SOL
.496
MW-4*
.136
>SOL
45.797
>SOL
>SOL
>SOL
.488
MW-6R*
.182
>SOL
71.522
>SOL
>SOL
>SOL
.640
MW-7*
.182
>SOL
71.522
>SOL
>SOL
>SOL
.640
MW-8*
.159
>SOL
59.278
>SOL
>SOL
>SOL
.565
MW-9*
.063
290
18.715
>SOL
>SOL
>SOL
.228
MW-11*
.053
214
15.474
>SOL
>SOL
25.700
.195
MW-13*
.059
262
17.525
>SOL
>SOL
>SOL
.216
MW-14*
.142
>SOL
50.171
>SOL
>SOL
>SOL
.506
MW-15*
.041
124
11.131
>SOL
>SOL
12.243
.150
MW-17*
.027
51.358
6.680
115
>SOL
3.709
.101
MW-18*
.035
88.757
9.160
161
>SOL
7.783
.129
MW-19*
.039
114
10.587
188
>SOL
10.904
.144
MW-20*
.036
96.302
9.605
170
>SOL
8.695
.134
MW-21*
.024
38.121
5.626
95.557
>SOL
2.438
.089
*These monitor wells are at or below detection limits, or calculated SSTLs
Pictures:

(See attached file: Millers Corner 002.jpg) (See attached file: Millers Corner 003.jpg) (See attached file: Millers Corner 005.jpg)
SizeFile Name
799 KB Millers Corner 002.jpg
660 KB Millers Corner 003.jpg
588 KB Millers Corner 005.jpg
MAPS:
Area

(See attached file: WHEELER-CO-SURVEY-version2000 Model (1).pdf)

SizeFile Name
315 KB WHEELER-CO-SURVEY-version2000 Model (1).pdf
Benzene Contour

(See attached file: Benzene Isocontours.pdf)
Site Specifications:


1. The house across the highway is also owned by Jim Miller and is currently not occupied.

2. There is an area of concrete in front of the business that measures approximately 60 feet by 21 feet that will need to be replaced in its entirety at the end of the cleanup for final payment. The surrounding asphalt around the area of concrete will also need to be replaced or repaired as needed.

3. This site is not a candidate for overexcavation.

4. Department of Roads right-of-way will be a concern as the plume is remediated on both sides of the highway.

5. There is 220 volt single phase power at the site. 220 volt three phase power is about 1 mile away according to Jim Miller. If three phase is needed check with the local power company to confirm that and make arrangements.

6. There will be a soil SSTL for this cleanup. The soil SSTL will not be used for interim payments. It will only be used for the final payment. NDEQ will verify that the soil SSTL has been met during the monitoring period. The soil SSTL level will be 1.496 mg/kg for Benzene. This maximum level of contamination must be met over the extent of the plume.

7. The monitoring period for this Contract is one year.
Site Questions and Answers: