Date: 1/27/06 
Site Name: Farmers Union Coop, Stanton
UG# 022792-NM-0941
Address: 800 10th Street or 10th and Hwy 24
County: Stanton
Closest Town Stanton
Legal Description: SW, SE, Sec 20 T23N R2E
Contractor Performing Assessment: RDG
Tier 1 Date: 4/10/00 
Tier 2 Date: 12/23/04 
Property Owner’s Name: Mrs. Debbie Hoehne (pronounced Haney)
Property Owner’s Phone Number: (402) 439-2744
Contamination Types: Free Product
PFP Bid Number: NE-015
Posting Date: 1/27/06 
Closing Date for requesting clarifications from the NDEE: 4/5/06 
Clarifications to relevant qustions will be issued by the NDEE by: 4/12/06 
Bid Submittal Deadline 5/5/06 at 2:00 pm central time.
Site Summary:

This site is located along the Elkhorn River in Stanton County. Ground water averages about 32 feet below the surface, and this remediation will be for free product cleanup only. NDEQ became aware of this site in late 1991 due to closure of UST's. The site status was changed to "orphan" in late 2002 and the site was activated. During the Tier 1 investigation, free product was detected.
Table 1. Final Tier 2 Sampling Results:

Well Number

Thickness of Free Product in Feet
MW-1
1.76
MW-2
1.99
MW-3
.05
MW-8
1.17
MW-9
.37
MW-11
1.03
MW-14
.45

Sampled January 25, 2006
Table 2. SSTLs:

Free product cleanup is required to less than .01 foot. This also applies to all wells surrounding the current free product plume or any wells drilled for verification purposes.
Pictures:

(See attached file: Looking NW.JPG)

(See attached file: Stanton 2.JPG)

(See attached file: Stanton 7.JPG)

SizeFile Name
299 KB Looking NW.JPG
321 KB Stanton 2.JPG
308 KB Stanton 7.JPG
MAPS:
Area

(See attached file: Fmr Farmers Coop-Stanton Survey Plat.pdf)
SizeFile Name
254 KB Fmr Farmers Coop-Stanton Survey Plat.pdf
Benzene Contour

and Free Product Contour.

(See attached file: Frm Stanton Coop Free Product and Benzene Map.pdf)
Site Specifications:

1. Free product cleanup only.

2. Mrs. Hoehne would like a call from the Contractors before you visit the site.

3. There will be an auction for the property inside the building on April 8, 2006. No work can be performed during that day.

4. As you may have noted, the Village of Stanton did allow RDG to install wells on edges of the streets to the West and South of the building. You will need to check with the Village to see if that policy will continue for remediation. The street island just South of the building may be a canadidate for well location(s) also.

5. This site is not a canadidate for overexcavation.

6. There is a good location on the East side of the building for a remediation trailer with 220 power near by. Please work with Mrs. Hoehne for an exact location.

7. There is a newly installed SVE/AS system one block East of this site at an RP-led site.

8. Mrs. Hoehne wants to sell the property some time in the future. The new owners will be informed that a multi-year cleanup will be in progress.
Site Questions and Answers: