Date: 5/13/03 
Site Name: Freed's Corner
UG# 021491-JB-1030
Address: NW Corner of Hwy. 92 and Hwy 14
County: Merrick
Closest Town Central City
Legal Description: SE1/4, SE 1/4 Sec9, T14N, R6W
Contractor Performing Assessment: rdg Geoscience
Tier 1 Date: 2/19/02 
Tier 2 Date: 1/30/03 
Property Owner’s Name: Tom Blodgett
Property Owner’s Phone Number: Home 308-946-3932, Shop 308-946-2818
Contamination Types: Gasoline and Diesel
PFP Bid Number: NE-006
Posting Date: 5/13/03 
Closing Date for requesting clarifications from the NDEE: 8/8/03 
Clarifications to relevant qustions will be issued by the NDEE by: 8/13/03 
Bid Submittal Deadline 8/29/03 at 2:00 pm central time.
Site Summary:


The Freed's Corner site, located approximately five miles north of Central City, was first reported to the Department on February 14, 1991 as a result of a tank pull. The owner of the property who pulled the tanks never used the tanks, and the site was placed on the orphan tank list. The site was activated in January of 2001, and the Tier 1 and Tier 2 process was initiated.
Table 1. Final Tier 2 Sampling Results:


A complete round of sampling will be done after this site is posted to take an additional look at the contamination levels. The levels posted below in Table 1 are the results from the addendum to the Tier 2 sampled November of 2002. Also posted (split cells) are the highest historical levels observed since the site was activated. Please note that the levels of contamination have been significantly higher in several wells (such as MWs-1, 2, 3, 7, 8 and 10) as noted by the June 14, 2002 sampling event. RBCA SSTLs will be established on these wells (see Table 2) irrespective of the contamination levels indicated during the pending sampling event. Free product has also been observed in MW-1 and MW-7 in the past. If you are considering a bid on this site make sure you have a copy of the RBCA Tier 2 report. I'll notify you when the pre-bid, final round of sampling results are posted.
COC concentration in parts per million (mg/l)
Well
Benzene
Toluene
Ethylbenzene
Xylenes
MTBE
n-Hexane
Naphthalene
TEH-Diesel
Total Conc.
MW-1
FP/FP
FP/FP
FP/FP
FP/FP
ND
FP/FP
FP/FP
FP/FP
FP/FP
MW-2
.460/.639
.589/1.320
.056/1.470
7.040/9.000
ND
.208/.261
.474/.632
7.800
16.627
MW-3
.043/.257
ND/.006
ND/.005
ND/.021
ND
.012/.011
ND/ND
ND
.033
MW-4
ND
ND
.002/.002
.004/.004
ND
ND
ND
ND
.006
MW-5
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-6
ND/.004
ND
ND
ND
ND
ND
ND
ND
.004
MW-7
FP/FP
FP/FP
FP/FP
FP/FP
ND
FP/FP
FP/FP
FP/FP
FP/FP
MW-8
.055/.073
.013/.013
.063/.063
.984/.984
ND
.009/016
.219/.219
2.660/2.660
4.003
MW-9
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-10
ND/.886
ND/.013
ND/.003
ND/.050
ND
ND/.001
ND/.032
ND
ND
MW-11
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-12
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-13
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-14
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-15
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-16
ND
ND
ND
ND
ND
ND
ND
ND
ND

Split Cells- First number is 6/24/03 sampling event and second number is the highest reported level for that well.
If the duplicate sample was higher, that number was used.
Table 2. SSTLs:

Well

Benzene
Toluene
Ethylbenzene
Xylenes
MTBE
n-Hexane
Naphthalene
MW-1
.079
35.700
13.100
191.000
.314
>Sol
1.030
MW-2
.071
27.900
11.500
167.000
.283
>Sol
.753
MW-3
.079
35.700
13.100
191.000
.314
>Sol
1.030
MW-7
.079
35.700
13.100
191.000
.314
>Sol
1.030
MW-8
.020
6.280
3.170
45.700
.082
>Sol
.150
MW-10
.045
15.900
7.100
103.000
.178
>Sol
.411
Pictures:


MAPS:
Area


(See attached file: Freeds Survey.pdf)

SizeFile Name
424 KB Freeds Survey.pdf
Benzene Contour



(See attached file: Freeds Benzene 7-30-02.pdf)


(See attached file: Freeds Benzene 11-12-02.pdf)


(See attached file: Benzene 6-24-03.pdf) Free product map from most recent sampling event. (See attached file: Free Product 6-24-03.pdf)
Site Specifications:


1. The legal survey map does not have new monitor the wells drilled November of 2002. Please see the Addendum to the RBCA Tier 2 evaluation dated 1/30/2003 for the location of the new monitor wells.

2. The groundwater levels have risen about 4' since the last November sampling event.

3. Overexcavation is approved at this site.

4. The owner would like a call before you visit the site.

5. A lot of the work will be done on Department of Roads (DOR) right-of-way. DEQ received a permit to drill monitor wells from DOR but we did not talk about overexcavation at that time. The owner knows the DOR representative.
Site Questions and Answers:


Comments: Over the course of the investigation phase, groundwater levels have been observed to fluctuate substantially with a drop during the summer months. It is thought the reason for this is an aquifer that is only 20 to 30 feet thick and four irrigation wells are located close-by. It appears that the aquifer is limited, and drawdown of a pumping well should be significant. Because of these aquifer traits, caution is warranted during remediation design as any system using pump and treat might dewater the domestic well that the Department is protecting. Because of the current drought in the State, the potential for dewatering the aquifer is enhanced. This drop in water levels is also affecting the contamination levels of the plume. Summer and winter Benzene plume maps are shown on the web site to illustrate the point. These are also the reasons the Department will perform one additional round of sampling as stated above. Please see the complete files for further documentation and to formulate your own interpretation of the hydrogeologic characteristics of this area.

Attached below is a copy of the access agreement with the land owner to the East of the property.
(See attached file: Freed's Corner Access Agreement.doc)