Date: 6/2/03 
Site Name: White Star Oil
UG# 022291-KM-1100
Address: 305 N 6th St.
County: Boone
Closest Town Albion
Legal Description: SE NE NE S21, T20N, R6W
Contractor Performing Assessment: Terracon
Tier 1 Date: 9/13/94 
Tier 2 Date: 6/3/03 
Property Owner’s Name: John Sellhorst
Property Owner’s Phone Number: 402-395-2507
Contamination Types: Gasoline and Diesel
PFP Bid Number: NE-009
Posting Date: 6/20/03 
Closing Date for requesting clarifications from the NDEE: 8/8/03 
Clarifications to relevant qustions will be issued by the NDEE by: 8/13/03 
Bid Submittal Deadline 8/29/03 at 2:00 pm central time.
Site Summary:

White Star Oil sits in east central Nebraska on the geologic flood plain of Beaver Creek approximately 1,000 feet southwest of the river. The contamination at the site was first documented in 1991 during a tank removal. In 1994 the site was activated under the orphan tank program, and a Detailed Site Assessment (DSA) was performed at the site. The DSA report indicated that a large dissolved plume existed at the site as well as a large free product plume. The site was put on hold by the Department due to financial constraints until early 2002 when it was re-activated. Since then several new monitor wells have been installed to more completely define both types of plumes. The Department is requesting a bid for a dual purpose, free product and dissolved cleanup from one PFP Contractor at this site. As the free product covers 11 wells, levels of dissolved contamination under the free product plume will have to be assumed. The Department has made the decision that the dissolved level for Benzene shall be 30 mg/l for the monitor wells that contain free product. Benzene will be the only "driver" for this site for dissolved incremental payment levels. The SSTLs have been established for all constituents, but they will only be used for the final payment.


Table 1. Final Tier 2 Sampling Results:


COC Concentrations are in parts per million (mg/l).
Numbers in red are assumed and/or exceed SSTLs.
Well
Benzene
Toluene
Ethylbenzene
Xylenes
MTBE
n-Hexane
Naphthalene
TEH-
Diesel
Total Conc.
MW-9
30
FP
FP
FP
FP
FP
FP
FP
Unk.
MW-11
18.100
.300
1.740
8.860
.141
ND
ND
2.380
31.521
MW-13
30
FP
FP
FP
FP
FP
FP
FP
Unk.
MW-14
3.220
ND
.014
.095
.022
ND
ND
1.370
4.721
MW-15
1.430
ND
ND
.334
.100
ND
ND
ND
1.864
MW-17
30
FP
FP
FP
FP
FP
FP
FP
Unk.
MW-18
30
FP
FP
FP
FP
FP
FP
FP
Unk,
MW-19
30
FP
FP
FP
FP
FP
FP
FP
Unk.
MW-20
30
FP
FP
FP
FP
FP
FP
FP
Unk.
MW-28
30
FP
FP
FP
FP
FP
FP
FP
Unk.
MW-34
1.360
.028
.189
1.860
.005
.015
.055
.972
4.484
BMW-1
15.200
19.100
5.320
27.300
ND
1.020
2.220
121
191.160
Plume Initial Concentration
231.391
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Plume SSTL Concentration
75.78
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Plume Initial Concentration above SSTLs
155.611
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Final Tier 2 Sampling Continued
MW
B
E
T
X
MTBE
n-H
Nap.
TEH
Total
MW-1
FP
FP
FP
FP
FP
FP
FP
FP
FP
MW-2
FP
FP
FP
FP
FP
FP
FP
FP
FP
MW-5
FP
FP
FP
FP
FP
FP
FP
FP
FP
MW-6
FP
FP
FP
FP
FP
FP
FP
FP
FP
MW-7*
ND
ND
ND
ND
ND
ND
NA
ND
ND
MW-16*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-21*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-22*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-23*
ND
ND
ND
ND
.012
ND
ND
ND
.012
MW-24*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-25*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-26*
ND
ND
ND
ND
.005
ND
ND
ND
ND
MW-27*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-29*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-30*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-31*
.015
ND
ND
.018
ND
ND
ND
ND
.033
MW-32*
.016
ND
ND
.021
ND
ND
ND
ND
.037
MW-33*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-35*
.025
ND
.010
.022
ND
ND
ND
.493
.550
MW-36*
.006
ND
ND
.003
.001
ND
ND
ND
.010
MW-37*
.009
ND
ND
ND
ND
ND
ND
ND
.009
BMW-2*
.059
ND
.316
.004
ND
ND
ND
1.400
1.499

* These monitor wells are at or below detection limits or calculated SSTLs.






Free Product Thickness as of May 16, 2003.

Monitor Well
Thickness of Free Product In Feet
MW-1
2.23
MW-2
.35
MW-5
.10
MW-6
.94
MW-9
1.54
MW-13
.05
MW-17
.03
MW-18
1.05
MW-19
.11
MW-20
.28
MW-28
.09





Table 2. SSTLs:

Well

Benzene
Toluene
Ethylbenzene
Xylenes
MTBE
n-Hexane
Naphthalene
TEH-Diesel
MW-1
61.3
>Sol
>Sol
>Sol
380
>Sol
>Sol
816
MW-2
227
>Sol
>Sol
>Sol
1,040
>Sol
>Sol
1,580
MW-5
227
>Sol
>Sol
>Sol
1,040
>Sol
>Sol
1,580
MW-6
139
>Sol
Sol
>Sol
763
>Sol
>Sol
1,410
MW-7
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-9
8.430
>Sol
>Sol
>Sol
70.800
>Sol
>Sol
223
MW-11
1.79
>Sol
>Sol
>Sol
19.900
>Sol
>Sol
92.600
MW-13
1.13
>Sol
>Sol
>Sol
13.700
>Sol
>Sol
72.900
MW-14
.172
>Sol
>Sol
>Sol
3.08
>Sol
>Sol
30.200
MW-15
.172
>Sol
>Sol
>Sol
3.08
>Sol
>Sol
30.200
MW-16
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-17
18.900
>Sol
>Sol
>Sol
139
>Sol
>Sol
370
MW-18
2.76
>Sol
>Sol
>Sol
28.200
>Sol
>Sol
117
MW-19
5.96
>Sol
>Sol
>Sol
53.100
>Sol
>Sol
182
MW-20
17.100
>Sol
>Sol
>Sol
128
>Sol
>Sol
348
MW-21
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-22
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-23
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-24
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-25
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-26
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-27
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-28
13.000
>Sol
>Sol
>Sol
102
>Sol
>Sol
292
MW-29
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-30
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-31
.015
1.000
.700
10.000
.020
4.000
.020
10.000
MW-32
.016
1.000
.700
10.000
.020
4.000
.020
10.000
MW-33
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-34
.707
>Sol
>Sol
>Sol
9.420
>Sol
>Sol
57.700
MW-35
.025
1.000
.700
10.000
.020
4.000
.020
10.000
MW-36
.006
1.000
.700
10.000
.020
4.000
.020
10.000
MW-37
.009
1.000
.700
10.000
.020
4.000
.020
10.000
BMW-1
5.66
>Sol
>Sol
>Sol
50.900
>Sol
>Sol
176





Pictures:


MAPS:
Area

(See attached file: 104su3.pdf)

SizeFile Name
132 KB 104su3.pdf
Benzene Contour

(See attached file: 4E006R19.pdf)


Free Product Area and Thickness Map

(See attached file: 4E006R18.pdf)


Site Specifications:

1. From the photos you can see that the entire area is concrete paved.

2. This is an operating service station/convenience store.

3. There will be several adjoining properties at this site that will be involved during the cleanup, including the Railroad. The owners' names, addresses and phone numbers are in the June 2, 2003 Terracon report.

4. NDEQ will split the total bid price 60/40 for the two parts of the Contract. 40% will be applied to the Free Product portion of the Contract and 60% to the dissolved part of the Contract. There is no change that will occur to the existing free product and dissolved contracts in the bid package. NDEQ will simply be incorporating both parts under one Contract, and the PFP Contractor will still have incremental cleanup goals for both parts as before. The PFP Contractor will also have complete freedom to work on both parts of the cleanup at the same time or one part of the Contract as he/she deems necessary.

5. The monitoring period for this site will be two years.

6. For bidding purposes, this site will have one "total cost" and one "time to cleanup" bid for the entire project.

Site Questions and Answers: