Date: 10/4/10 
Site Name: Heckman Site
UG# 062893-NM-0809
Address: Main St. Between 2nd & 3rd
County: Pierce
Closest Town Hadar
Legal Description: SE1/4, SE1/4, SW1/4 S 29 T25N R1W
Contractor Performing Assessment: Terracon
Tier 1 Date: 1/2/06 
Tier 2 Date: 6/30/06 
Property Owner’s Name: Farrell Heckman
Property Owner’s Phone Number: 402-841-2075
Contamination Types: Gasoline & Diesel
PFP Bid Number: NE-037
Posting Date: 12/21/10 
Closing Date for requesting clarifications from the NDEE: 1/21/11 
Clarifications to relevant qustions will be issued by the NDEE by: 12/28/10 
Bid Submittal Deadline 3/4/11 at 2:00 pm central time.
Site Summary:

The Heckman Property site in Hadar was added to the orphan priority list in 2001, after reports of petroleum contaminated drinking water were filed with the Department, and no clear source was known. In 2004 a geoprobe was used to evaluate the entire area for contamination and to search for the source(s) of the petroleum contamination. Several USTs were found in the area between and near the two Quonset buildings on the Heckman property. These tanks were removed in 2005. In 2006, NDEQ had the State Contractor (Terracon) perform a Tier 1 & Tier 2 which confirmed petroleum present in the groundwater. Hadar has no municipal drinking water system, so all of the homes in the town have a private water well.

A set of deeper observation wells are present at the site and the PFP Contractor will be responsible for the maintenance and eventual abandonment of these wells. The deeper wells will not be used for incremental or final payment; however, NDEQ may be sampling these wells periodically for information purposes.
Table 1. Final Tier 2 Sampling Results:

Well
Benzene
Toluene
Ethylbenzene
Xylenes
MTBE
n-Hexane
Naphthalene
Diesel
Total Concentration
MW-8
.0873
.016
.0549
.139
ND
.0171
.0168
ND
.3311
Total Concentration of Wells Exceeding SSTLs
.0873
.016
.0549
.139
ND
.0171
.0168
ND
.3311
SSTL Total From Table 2
.023
37.137
4.896
86.917
.086
>SOL
4.950
41.882
175.891
Concentration Over SSTls **
.0643
Not Over
Not Over
Not Over
Not Over
Not Over
Not Over
Not Over
Not Over
MW-1*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-2*
.00390
.0253
.146
.367
ND
.0682
.0709
ND
.6813
MW-3*
.00784
.017
.101
.215
ND
.0172
.0277
.517
.90274
MW-4*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-5*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-6*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-7*
ND
ND
ND
ND
ND
ND
ND
ND
ND
MW-9*
ND
ND
ND
ND
ND
ND
ND
ND
ND
Units in mg/l sampled on 10/15/10.
* These monitor wells are at or below detection limits or calculated SSTLs.
**The concentration over the SSTLs is the amount used to calculate the 25, 50, and 75% reduction payment.
Table 2. SSTLs:

Well

Benzene
Toluene
Ethylbenzene
Xylenes
MTBE
n-Hexane
Naphthalene
Diesel
MW-8
.023
37.137
4.896
86.917
.086
>SOL
4.950
41.882









MW-1
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-2
.005
1.000
.700
10.000
.020
4.000
.0709
10.000
MW-3
.00784
1.000
.700
10.000
.020
4.000
.0277
10.000
MW-4
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-5
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-6
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-7
.005
1.000
.700
10.000
.020
4.000
.020
10.000
MW-9
.005
1.000
.700
10.000
.020
4.000
.020
10.000
Pictures:

(See attached file: View 4.JPG)(See attached file: View 5.JPG)(See attached file: View 6.JPG)
SizeFile Name
684 KB View 4.JPG
640 KB View 5.JPG
648 KB View 6.JPG
MAPS:
Area

(See attached file: JEO survey 5-23-07 (1).pdf)
SizeFile Name
258 KB JEO survey 5-23-07 (1).pdf
Benzene Contour

(See attached file: Benzene.pdf)
Site Specifications:

1. The property owner requests you call him no less than one day before you visit the property.

2. If overexcavation is being considered by the PFP Contractor, please discuss this remedial option with the property owner and the Village.
Site Questions and Answers: